I now have track laid from the main (lower) yard, across the visible main line, to the top of the hill (sawmill yard), down the helix and back through the 4-track staging area, and linked back in with an optional continuous-run track (not used for normal operation, but nice to have for just letting a train run every now and then.
Roadbed is done up to the logging camp, and track is laid partway up, but I haven't yet finalized the track arrangement in the logging camp itself so I don't want to lay track too far and then have to move it.
No comments:
Post a Comment